Projects

Project Den Oever Long term

In 2008 Tocardo installed a T1 tidal...

Den Oever array pilot

In 2015 Tocardo installed three T1 turbines in the Afsluitdijk tidal barrage. The turbine array is an extension of...

Project Nepal

With the first batch of R1 turbines sold in 2012 Tocardo set foot in the Nepalese river energy market.

Project Texel

Texel has the ambition to become completely sustainable by 2020 and is well underway to do so. Many projects have been...

Kornwerderzand

The Dutch are famous for building sea defenses. With large parts of the country lying lower than the sea level...

R&D projects

This project will develop a new long-lasting solution to the problem of marine biofouling, offering specific...